Index: /branches/BNC_2.12/ChangeLog.txt
===================================================================
--- /branches/BNC_2.12/ChangeLog.txt	(revision 8059)
+++ /branches/BNC_2.12/ChangeLog.txt	(revision 8060)
@@ -6,17 +6,21 @@
     ADDED   (01.09.2016): number of allowed SSR biases is enlarged, some future
                           GLONASS signal and tracking mode identifier are added
+    ADDED   (08.08.2016): some informations about the data source is added as
+                          comment within the header of RINEX navigation files
+    ADDED   (21.07.2016): frequency specific signal priorities are added for
+                          RINEX version 3 to RINEX version 2 conversion
+    ADDED   (29.06.2016): consideration of provioder ID changes in SSR streams
+                          during PPP analysis
+    CHANGED (28.07.2016): small adaptations in qwtpolar sources to allow a
+                          successful comilation of BNC on a Rasperry Pi
+    CHANGED (21.07.2016): Default signal priority list
+    CHANGED (08.06.2016): weighting factor for GLONASS phase observations
+                          is now enlarged
+    CHANGED (27.05.2016): RINEX 2.11 ephemeris output for an unknown
+                          transmission time is set to 0.000000000000e+00
+    CHANGED (24.05.2016): the real satellite visibility is considered, if the
+                          expected observations are computed in RINEX QC
     FIXED   (12.08.2016): check regarding wrong observation epochs is done during
                           latency check as well to prevent erroneous latencies
-    ADDED   (08.08.2016): some informations about the data source is added as
-                          comment within the header of RINEX navigation files
-    CHANGED (28.07.2016): small adaptations in qwtpolar sources to allow a
-                          successful comilation of BNC on a Rasperry Pi
-    ADDED   (21.07.2016): frequency specific signal priorities are added for
-                          RINEX version 3 to RINEX version 2 conversion
-    CHANGED (21.07.2016): Default signal priority list
-    ADDED   (29.06.2016): consideration of provioder ID changes in SSR streams
-                          during PPP analysis
-    CHANGED (08.06.2016): weighting factor for GLONASS phase observations
-                          is now enlarged
     FIXED   (08.06.2016): map generation from sourcetable entry
     FIXED   (02.06.2016): the approach how to wait for clock corrections
@@ -25,8 +29,4 @@
     FIXED   (30.05.2016): some NMEA components in PPP output are fixed:
                           time stamp is now UTC, hDop value instead pDop value
-    CHANGED (27.05.2016): RINEX 2.11 ephemeris output for an unknown
-                          transmission time is set to 0.000000000000e+00
-    CHANGED (24.05.2016): the real satellite visibility is considered, if the
-                          expected observations are computed in RINEX QC
 
 --------------------------------------------------------------------------------
