Changeset 8060 in ntrip
- Timestamp:
- Sep 28, 2016, 3:50:53 PM (8 years ago)
- File:
-
- 1 edited
Legend:
- Unmodified
- Added
- Removed
-
branches/BNC_2.12/ChangeLog.txt
r8033 r8060 6 6 ADDED (01.09.2016): number of allowed SSR biases is enlarged, some future 7 7 GLONASS signal and tracking mode identifier are added 8 ADDED (08.08.2016): some informations about the data source is added as 9 comment within the header of RINEX navigation files 10 ADDED (21.07.2016): frequency specific signal priorities are added for 11 RINEX version 3 to RINEX version 2 conversion 12 ADDED (29.06.2016): consideration of provioder ID changes in SSR streams 13 during PPP analysis 14 CHANGED (28.07.2016): small adaptations in qwtpolar sources to allow a 15 successful comilation of BNC on a Rasperry Pi 16 CHANGED (21.07.2016): Default signal priority list 17 CHANGED (08.06.2016): weighting factor for GLONASS phase observations 18 is now enlarged 19 CHANGED (27.05.2016): RINEX 2.11 ephemeris output for an unknown 20 transmission time is set to 0.000000000000e+00 21 CHANGED (24.05.2016): the real satellite visibility is considered, if the 22 expected observations are computed in RINEX QC 8 23 FIXED (12.08.2016): check regarding wrong observation epochs is done during 9 24 latency check as well to prevent erroneous latencies 10 ADDED (08.08.2016): some informations about the data source is added as11 comment within the header of RINEX navigation files12 CHANGED (28.07.2016): small adaptations in qwtpolar sources to allow a13 successful comilation of BNC on a Rasperry Pi14 ADDED (21.07.2016): frequency specific signal priorities are added for15 RINEX version 3 to RINEX version 2 conversion16 CHANGED (21.07.2016): Default signal priority list17 ADDED (29.06.2016): consideration of provioder ID changes in SSR streams18 during PPP analysis19 CHANGED (08.06.2016): weighting factor for GLONASS phase observations20 is now enlarged21 25 FIXED (08.06.2016): map generation from sourcetable entry 22 26 FIXED (02.06.2016): the approach how to wait for clock corrections … … 25 29 FIXED (30.05.2016): some NMEA components in PPP output are fixed: 26 30 time stamp is now UTC, hDop value instead pDop value 27 CHANGED (27.05.2016): RINEX 2.11 ephemeris output for an unknown28 transmission time is set to 0.000000000000e+0029 CHANGED (24.05.2016): the real satellite visibility is considered, if the30 expected observations are computed in RINEX QC31 31 32 32 --------------------------------------------------------------------------------
Note:
See TracChangeset
for help on using the changeset viewer.