Changeset 2476 in ntrip


Ignore:
Timestamp:
May 7, 2010, 4:53:25 PM (15 years ago)
Author:
weber
Message:

* empty log message *

File:
1 edited

Legend:

Unmodified
Added
Removed
  • trunk/BNC/bnchelp.html

    r2475 r2476  
    11151115<p>
    11161116When 'Use phase obs' is set in BNC the PPP solution will be carried out using both code and phase observations. A sigma of 5.0 m for code observations and a sigma of 0.02 m for phase observations (defauls) is used to combine both types of observations.
    1117 As the convergence characteristic of a PPP solution can be influenced by the relation between the sigmas for code and phase observations, you may like to introduce you own sigma for code observations which differs from the default of 5.0 m.
     1117As the convergence characteristic of a PPP solution can be influenced by the ratio of the sigmas for code and phase observations, you may like to introduce you own sigma for code observations which differs from the default of 5.0 m.
    11181118<ul>
    11191119<li>Introducing a smaller sigma (higher accuracy) for code observations leads to better results shortly after the program start. However, it may take more time till you finally get the best possible coordinates.</li>
Note: See TracChangeset for help on using the changeset viewer.